← All buildings
BCS 2810·PILOT SAMPLE·Older concrete tower — windows + parkade remediation

Skyline Pinnacle

950 Georgia Street, Vancouver, BC V6C 3H2

Year built1998
Floors48
Units384
ConstructionConcrete tower
OccupancyResidential
PHOTOGRAPHY IN PRODUCTION · CSS ELEVATION PLACEHOLDER
01Overview

Building summary — facts, not a score.

Window-wall envelope failure — documented, remediated (2012)Substantially remediated
Parkade waterproofing — partial; deficiency reportedDeficiency reported
Special levies — four identifiedFunding approved
Legal cases — two locatedStatus unknown
Elevator modernization — permit located, completedCompletion independently documented
Post-remediation window concern — single-sourcePost-remediation issue reported

Note: “No evidence located” means exactly that — no evidence was located in the sources searched. It is not proof that no problem exists. Further professional review is recommended.

02Evidence timeline

What happened, when, and how we verified it.

Sep 29, 2025Recurrence reportedREVIEW OPEN

Two suites report condensation at new window frames; cause unconfirmed.

Post-remediation issue reportedSingle-source reportedsource · p. 7
Nov 15, 2023Elevator

Elevator modernization complete; all 6 cabs, signed off.

Completion independently documentedMulti-source reportedsource · p. 11
Jul 22, 2021Special levy

Levy of CAD 1.95M for parkade waterproofing Phase 1.

Funding approvedDocument verifiedsource · p. 4
Apr 9, 2019Parkade

Parkade slab waterproofing deficiencies identified; partial scope.

Deficiency reportedDocument verifiedsource · p. 6
Oct 30, 2012Repair completed

Window-wall replacement complete across all floors.

Substantially remediatedDocument verifiedsource · p. 22
May 20, 2010Special levy

Levy of CAD 6.20M approved for full window-wall replacement.

Funding approvedDocument verifiedsource · p. 5
Feb 11, 2009Windows

Window-wall failure survey; water ingress at multiple suites.

Investigation in progressDocument verifiedsource · p. 8
Evidence classes
Official recordDocument verifiedMulti-source reportedSingle-source reportedUnverified public mentionAI inference
03Repairs & assessments

Major work — proposed, approved, started, completed.

Sep 29, 2025Recurrence reportedREVIEW OPEN

Two suites report condensation at new window frames; cause unconfirmed.

Post-remediation issue reportedSingle-source reportedsource · p. 7
Nov 15, 2023Elevator

Elevator modernization complete; all 6 cabs, signed off.

Completion independently documentedMulti-source reportedsource · p. 11
Jul 22, 2021Special levy

Levy of CAD 1.95M for parkade waterproofing Phase 1.

Funding approvedDocument verifiedsource · p. 4
Apr 9, 2019Parkade

Parkade slab waterproofing deficiencies identified; partial scope.

Deficiency reportedDocument verifiedsource · p. 6
Oct 30, 2012Repair completed

Window-wall replacement complete across all floors.

Substantially remediatedDocument verifiedsource · p. 22
May 20, 2010Special levy

Levy of CAD 6.20M approved for full window-wall replacement.

Funding approvedDocument verifiedsource · p. 5
Feb 11, 2009Windows

Window-wall failure survey; water ingress at multiple suites.

Investigation in progressDocument verifiedsource · p. 8

A permit does not prove completion. A discussion does not prove approval. An approval does not prove the work started.

04Permits

Municipal permit history.

NumberTypeDescriptionIssuedCompletedStatusMatch
BP-2010-07-0950BuildingWindow-wall replacement2010-07-142012-10-30Completedhigh
BP-2021-09-0950BuildingParkade waterproofing Phase 12021-09-20In progresshigh
EP-2022-01-0950ElectricalElevator modernization (6 cabs)2022-01-302023-11-15Completedhigh
06Documents

Source documents on file.

Engineering reportRDH EngineeringdocverPRIVATE
SGM minutesStrata BCS 2810docverPRIVATE
Council minutesStrata BCS 2810docverPRIVATE
Engineering reportBBAdocverPRIVATE
SGM minutesStrata BCS 2810docverPRIVATE
Council minutesStrata BCS 2810docverPRIVATE
Council minutesStrata BCS 2810docverPRIVATE
AGM minutesStrata BCS 2810docverPRIVATE
Permit registryCity of VancouverofficialPUBLIC
Court registryCourt Services OnlineofficialPUBLIC
Tribunal decisionCivil Resolution TribunalofficialPUBLIC
07Rules & bylaws

Documented rules and their practical effect.

Renovation

No owner-installed window coverings altering exterior appearance.

Preserves envelope warranty.

Effective 2012-12-01
Amenity

Guest suite max 3 nights; deposit required.

Standard guest-suite rule.

Effective 2005-01-01
08Management history

Who has managed the building, and when.

Crestmont Strata Services2005-01-012019-12-31high
Quayline Strata Partners2020-01-01presenthigh
09Photos

Structured photo categories.

PHOTOGRAPHY IN PRODUCTION
ExteriorTower from Georgia Street (post window-wall)Photography in production
PHOTOGRAPHY IN PRODUCTION
WindowsNew window-wall detail, floor 30Photography in production
PHOTOGRAPHY IN PRODUCTION
ParkadeParkade slab — Phase 1 areaPhotography in production
PHOTOGRAPHY IN PRODUCTION
ElevatorModernized cab interiorPhotography in production

Photos omit identifiable residents, unit numbers linked to occupants, faces, licence plates, and sensitive security details.

10Sources

Every claim, traceable to a source.

s-eng-2009Engineering reportRDH EngineeringdocverPRIVATE
s-sgm-2010SGM minutesStrata BCS 2810docverPRIVATE
s-council-2012Council minutesStrata BCS 2810docverPRIVATE
s-eng-2019Engineering reportBBAdocverPRIVATE
s-sgm-2021SGM minutesStrata BCS 2810docverPRIVATE
s-council-2023Council minutesStrata BCS 2810docverPRIVATE
s-council-2025Council minutesStrata BCS 2810docverPRIVATE
s-agm-2019AGM minutesStrata BCS 2810docverPRIVATE
s-permitsPermit registryCity of VancouverofficialPUBLIC
s-courtsCourt registryCourt Services OnlineofficialPUBLIC
s-crtTribunal decisionCivil Resolution TribunalofficialPUBLIC
Latest reviewed2026-06-14·Evidence records194