Central Station Tower
300 Station Avenue, Vancouver, BC V6B 5E2
Building summary — facts, not a score.
Note: “No evidence located” means exactly that — no evidence was located in the sources searched. It is not proof that no problem exists. Further professional review is recommended.
What happened, when, and how we verified it.
EV charging L2 expansion (60 stalls) issued.
Fire-alarm upgrade complete; commissioning signed off.
Fire-alarm panel replacement; full upgrade underway.
EV pilot complete; expansion to L2 planned.
EV charging pilot, parkade L1 (12 stalls).
Major work — proposed, approved, started, completed.
Fire-alarm upgrade complete; commissioning signed off.
Fire-alarm panel replacement; full upgrade underway.
A permit does not prove completion. A discussion does not prove approval. An approval does not prove the work started.
Municipal permit history.
| Number | Type | Description | Issued | Completed | Status | Match |
|---|---|---|---|---|---|---|
| EP-2017-04-0300a | Electrical | EV pilot L1 | 2017-04-10 | 2019-11-02 | Completed | high |
| FP-2022-06-0300 | Fire | Fire-alarm panel upgrade | 2022-06-18 | 2023-09-30 | Completed | high |
| EP-2025-03-0300b | Electrical | EV expansion L2 (60 stalls) | 2025-03-14 | — | In progress | high |
Court and CRT records located.
No legal cases located.
Source documents on file.
Documented rules and their practical effect.
“EV stall allocation by lottery annually; non-renewable transfer.”
Fair EV stall allocation.
Effective 2019-12-01Who has managed the building, and when.
Structured photo categories.
Photos omit identifiable residents, unit numbers linked to occupants, faces, licence plates, and sensitive security details.