← All buildings
BCS 3399 / 3400 / 3401·PILOT SAMPLE·Multi-tower development with shared amenities & multiple legal entities

Cedar Grove Estates

aka Cedar Grove (Towers A/B/C)

7700 Cedar Grove Crossing, Burnaby, BC V5J 0H2

Year built2006
Floors28
Units612
ConstructionThree-tower development, shared podium
OccupancyResidential + shared commercial
PHOTOGRAPHY IN PRODUCTION · CSS ELEVATION PLACEHOLDER
01Overview

Building summary — facts, not a score.

Three legal entities across one development — entity matching requiredStatus unknown
Shared amenity parkade serves all three towers — facility attribution flaggedStatus unknown
Roof replacement — Tower B only — documentedCompletion reported
Towers A/C — roof: no evidence located in the sources searchedNo evidence located
Special levies — two identified (Tower B roof; shared pool retiling)Funding approved
Legal cases — one located (shared facility dispute)Status unknown

Note: “No evidence located” means exactly that — no evidence was located in the sources searched. It is not proof that no problem exists. Further professional review is recommended.

02Evidence timeline

What happened, when, and how we verified it.

Jul 21, 2025Legal case

CRT dispute over shared-facility cost allocation between stratas resolved.

Completion independently documentedOfficial record
Sep 12, 2024Amenity closure

Shared pool closed for retiling; funded by all three stratas per shared-facility agreement.

Work in progressDocument verifiedsource · p. 3
May 30, 2022Repair completed

Tower B roof replacement reported complete; warranty registered.

Completion reportedDocument verifiedsource · p. 12
Feb 7, 2021Special levy

Levy of CAD 2.65M approved (Tower B strata only) for full roof replacement.

Funding approvedDocument verifiedsource · p. 8
Mar 19, 2020Engineering assessment

Roof assessment for Tower B only; Towers A and C not assessed in this report.

Investigation in progressDocument verifiedsource · p. 2
Oct 11, 2018Roof

Tower B roof membrane failures reported across several floors during rains.

Current active issueMulti-source reportedsource · p. 5
Evidence classes
Official recordDocument verifiedMulti-source reportedSingle-source reportedUnverified public mentionAI inference
03Repairs & assessments

Major work — proposed, approved, started, completed.

May 30, 2022Repair completed

Tower B roof replacement reported complete; warranty registered.

Completion reportedDocument verifiedsource · p. 12
Feb 7, 2021Special levy

Levy of CAD 2.65M approved (Tower B strata only) for full roof replacement.

Funding approvedDocument verifiedsource · p. 8
Mar 19, 2020Engineering assessment

Roof assessment for Tower B only; Towers A and C not assessed in this report.

Investigation in progressDocument verifiedsource · p. 2
Oct 11, 2018Roof

Tower B roof membrane failures reported across several floors during rains.

Current active issueMulti-source reportedsource · p. 5

A permit does not prove completion. A discussion does not prove approval. An approval does not prove the work started.

04Permits

Municipal permit history.

NumberTypeDescriptionIssuedCompletedStatusMatch
BP-2021-09-7700BBuildingTower B roof replacement2021-09-152022-05-30Completedhigh
BP-2024-10-7700SBuildingShared pool retiling2024-10-02In progressmedium
06Documents

Source documents on file.

Council minutesStrata BCS 3400docverPRIVATE
Engineering reportRJCdocverPRIVATE
SGM minutesStrata BCS 3400docverPRIVATE
Council minutesStrata BCS 3400docverPRIVATE
Shared facilities agreement + minutesCedar Grove Shared Facilities Corp.docverPRIVATE
Tribunal decisionCivil Resolution TribunalofficialPUBLIC
Permit registryCity of BurnabyofficialPUBLIC
07Rules & bylaws

Documented rules and their practical effect.

Amenity

Pool guest limit 4 per suite; resident presence required; advance booking 72h.

Restricts pool guest access.

Effective 2007-01-01
Parking

Shared visitor parking allocated per tower by stall range; no cross-tower visitor parking.

Tower-segmented visitor parking.

Effective 2007-01-01
08Management history

Who has managed the building, and when.

Broadmoor Strata Management2006-09-01presentmedium
09Photos

Structured photo categories.

PHOTOGRAPHY IN PRODUCTION
ExteriorTowers A/B/C from Cedar Grove CrossingPhotography in production
PHOTOGRAPHY IN PRODUCTION
PoolShared pool — pre-retilingPhotography in production
PHOTOGRAPHY IN PRODUCTION
ParkadeShared visitor parking — L2Photography in production

Photos omit identifiable residents, unit numbers linked to occupants, faces, licence plates, and sensitive security details.

10Sources

Every claim, traceable to a source.

s-council-B-2018Council minutesStrata BCS 3400docverPRIVATE
s-eng-2020Engineering reportRJCdocverPRIVATE
s-sgm-B-2021SGM minutesStrata BCS 3400docverPRIVATE
s-council-B-2022Council minutesStrata BCS 3400docverPRIVATE
s-shared-2024Shared facilities agreement + minutesCedar Grove Shared Facilities Corp.docverPRIVATE
s-crt-sharedTribunal decisionCivil Resolution TribunalofficialPUBLIC
s-permitsPermit registryCity of BurnabyofficialPUBLIC
Latest reviewed2026-05-29·Evidence records218